Use filler to fill in any dips and apply a floor leveler for any humps in the floor.
Do you have to seal concrete before tiling floor.
After laying all the tile over the surface of the concrete slab allow the tile to rest for 24 hours before finishing the tile.
It is a good choice overall because it softens the surface and increases the comfort level when you walk across the floor.
From my understanding the screed will not need sealing if you are only going to fit laminate or carpet.
After all cracks and uneven areas in the concrete can cause damage to the tile above and uncontrolled moisture in the concrete can destroy the mortar and loosen the tiles.
Also ensure that the concrete is level.
For instance an old concrete floor that was tiled previously will probably not need a primer as long as the surface is clean and free from old adhesive and anything else that was stuck to the floor.
If it tests positive follow these asbestos abatement procedures.
A freshly screeded floor should be sealed before tiles are fitted unless a screed has been used that does not need sealing priming this screed is usually dust free so it seems as yours would require sealing for tiling.
This is particularly imported when laying tile as the floor needs to be as level as possible.
Step 3 mix.
Apply the grout and wipe off the excess grout with a damp or wet sponge.
Seal off the area with poly sheeting.
Although you don t need to install an underlayment between the concrete and the tile you need to prepare the surface before placing the tile.
Installing carpet also helps to insulate the interior of a basement by keeping the floor warm in cold weather.
How to seal a concrete floor for tiling.
If you re unsure about yours remove a tile and send it to a local asbestos abatement firm for testing.
Concrete contracts and expands at a different rate from the thinset mortar used to install tiles.
Before using the sealer ensure that it is mixed thoroughly.
Use grout to fill in the cracks between the tiles.
Before you lay any sort of tile whether it is stone ceramic or peel and stick vinyl you must prepare your concrete floor to ensure that the tiles will go down properly and stay where they re.
Jul 5 2010 1.
For that reason it is best to use an elastomeric crack.
Sealing your basement floor before installing carpet is a good idea.