Attach the flex duct to the duct board with a duct connector and a zip tie.
Duct to connect to floor duct.
Homeowners expanding their existing first floor duct work to the second floor need more space than walls typically provide so they must cut a hole in the.
3 don t use temporary tape also called duct tape to connect the flex duct inner liner to the metal takeoff elbow or register boot.
Floor ducts are located at the end of the duct work used to supply air to a room.
There are three types of boosters.
The allowable amount of sag is only 1 2 per 4 of.
The third type shown here is a recessed fan that fits into the duct and is flush with the floor.
Tape around the edges.
These pieces are connected to distribute air throughout the house.
When the main ducting is complete you can run the flex duct to each room s supply vent.
Another option is an in line fan that you can install in the duct line.
Forget floor insulation run a quick duct line and enjoy your space.
Tape around the edges as.
Add additional hangers as needed.
In retrofit applications many companies focus on sealing connections but they often don t truly address sagging ducts with proper strapping.
4 use mastic at every joint metal to metal and metal to plastic.
Find duct transitions connectors at lowe s today.
The simplest is a fan unit that sits on top of the register.
Seal the new flex duct to the new box with plastic ties keeping the connection between the duct and the box as tight as possible.
Recessed duct fans are sized to fit either a 4 x 10 in.
This keeps the duct up and away from the ground.
How to bring heat to the floor in a basement.
How to install floor ducts.
Connect remaining sections of the duct board with duct connectors or collars.
Or 4 x 12 in.
To ensure proper connections minimize leaks and maximize efficiency it is important to understand how to properly connect the duct work.
Running a duct from the first floor to the second involves creating a hole in the main duct and attaching new duct work that terminates in a floor level heat register on the second floor.
The ducts typically come in rectangular shapes and are attached to the bottom of the.
Jack rise spoke about how he tested a duct and measured a 2 wc change in static when he altered a duct from sagging to properly strapped.